Forgot to post my field fabricated pitch panshttps://images.platforum.cloud/uploads/20190331/5ecec16fc4054c4200faa73714f4b44b.jpg[/IMG[IMG]https://images.platforum.cloud/uploads/20190331/f23a2401c36fa9a419944badc99b83f2.jpg[/I'm[/quote]
Are those guys standing around in shorts the inspectors from the office?
Looks good , sure seems like black or dark colors are the in thing anymore.Still plugging away at the siding here... Been slow going. We're waiting on the PoCo to reinstall a mount for the main line before finishing up the last wall.
Sent from my SM-G903W using Tapatalk
Gott'r installed today.
http://www.fototime.com/D4D467FAC3944E1/orig.jpg[/
[img]http://www.fototime.com/DA133EF0CBD6BFF/orig.jpg[/img
The Room will be called "Steve's Board Room' It's actually the husbands ironing board :eek:
[img]http://www.fototime.com/BDE1EAF26E0CCF4/orig.jpg[/
Thanks Sno.[/quote]
Does that board fold up?
A basement huh?Oh look... A hole in the ground...
I think I'll help to fill it with mud and sticks [emoji106]![]()
Sent from my SM-G903W using Tapatalk
You are one fast SonofaGun at those pole barns. :thumbsup:We're getting there, should be able to wrap the exterior up tomorrow, except for the porch ceiling and posts.
It's supposed to rain Friday, so we'll work on the ceiling in the barn, gonna try hanging 40' sheets, so there's only one splice.
That telehandler platform is the shiznit,
3 guys installed the garage door header and windows , and did tyvek, trim, and siding on that gable end in 4 hours. [emoji106]
Sent from my SM-G930V using Tapatalk
Bet that one put gas in your tank,Time for bed. 202 hours in 3 weeks with a 26 hour solid shift to finish the project