Great client, probably our favorite client, this is our third project for her, second full project and she has other projects on different properties she still wants done.
She has used the same designer for decades, and neither of them is shy about changing their minds or pushing a decision to when they feel like making it lol.
This one may take the cake though. I didn't take pics of the old stair case that I can find but I will try and explain - looking down at the dock to the right side of the bridge we excited 7' wide to build concrete stairs down to the water. When they were formed and steel set they came by and the designer and the client decided that the stairs they had designed weren't what the wanted.
When a discerning client says tear it out you say yes ma'am and get to work tearing it out. I mean we were just about to pour. The forms you see to the bridge were a mock up which has since been approved and being built 😆
7300 ft, 4 master suites and a total of 7 bathrooms, we just crossed a year on this project, be another 3 months id guess with stuff still to pick out etc. Countertops are in and we still have one vanity that hasn't even been designed in the powder room lol. Probably be a total of 16 months. The three story 8300 ft house on Inks I bet we finish in 11 months, but everything was picked at foundation.
The retaining wall had to patched in the middle to close the opening
The sketch is the driveway with inlaid stone and the landscape package will be the nicest we've ever had installed