Gonna look really nice in the end. You have paneling going on the bottom?
Yes, got matching board and batten sitting there. Have a small roof/overhang that needs to be made/installed as well, couldn't make it until window was done. Plus two storm doors now and 4 other storms for that side of building.Gonna look really nice in the end. You have paneling going on the bottom?
Tail light warranty……..Not exactly what I wanted but it'll work. I wanted to put two 3/8x3" dowels in through the top but I just don't have enough space. Between what the plywood will cover and the taper on the legs I didn't want to chance something breaking because I'm pushing the limits on being near the edge of the miter joint and the legs. So 3" screws it is. One on either side of the miter. So between the leg being glued to the base, the screws on either side of the miter and the spline I'm pretty confident this joint will stay together for a while.
View attachment 558518
What happens if it fails the 7 day test? Concrete co pay for removal and new pour? Only head of testing in commercial around here.
I bought one a long time ago. I thought I might need one because I buy most of my wood in the rough. Turns out a rarely use it. I don’t even keep the battery in it. I bought this maple from someone I never bought from before so I thought I would check it.I don't even own a moisture meter.
That was a joke. I found it on Facebook.Did I miss it or ...did you post any pics of the crazy joists and blocking around the trees?
This is all temp for layout and it gives my client a look at elevations so they know what their view will be.Here's a better look see.
Well, I fell for it.That was a joke. I found it on Facebook.