I wish our HVAC subcontract work was as clean as yours--a fine job, it seems.Back at it again. Had to do my BIL driveway and sidewalk because him and my sister are in Florida. Ya, you heard that right. I get to snowblow his stuff while he's in a warm climate. I'm really glad it's cold down there now. Then off to Dad's for lunch. So I started after 2pm today. I swapped out the spring for the gas valve to the propane spring. The propane spring is red, this NG looks like it has a green tint to it.
View attachment 522484
Now I'm working on ducting. I'm starting with the PITA stuff first. Had to move more of my crap around to make room to pull up the floor.
View attachment 522486
And I needed to make room for a path.
View attachment 522487
After that I had to cut two of the 4x8s into 4x4s so I could pull them up. It's tongue and groove OSB.
View attachment 522489
I removed the left side insulation making room for a duct I would build for the space.
I got some 4x8 sheets of foil face polyisocyanurate. Some 1/2" and 1". I'll use the 1/2" for the ducts protected in the joist cavities and the 1" which will be coming off the furnace. I cut the sheets into strips and rabbeted 6 strips on both edges for the sides which will accept the sheet for the top and bottom.
View attachment 522490
I put them together with foil tape and put an end cap on them which stiffens up the box. So far I've made 18' of duct and have another approx 6' to go for this section.
View attachment 522491
Well, back to real work until next weekend I'm guessing.
Make sure to bring him a clump of bananas next time.The corbels talk - I have had a related conversation
When my brother came home from college he couldn't get a better paying gig so he went to work for us. Within 2 years he had started a cabinet shop and was building our cabinets and training guys. We have wildly different skill sets but he's an exceptional carpenter and beats the chit out of me on anything inside the house lol.
Anyway about 8 years ago I get a bill from Patton Cabinet Doors for a delivery and gasp deeply [emoji38] - and put pencil to paper. Seemed high. We have a face frame table and chit, why are we subbing
I go out to the shop and show him the bill - bro - why can't we build these doors? I think we pick xx.00$ per ft if we do the doors
i get the look i give the clients brother in law who hung drywall in a garage in college and now dares to second guess my decisions
He said you wanna make money or make doors?
I said - both [emoji38]
He said ok you figure out a way to blah blah blah blah change this jig blah blah blah need this equipment $$$ blah blah blah that is going to take x amount of hours etc etc...
I said ah. OK, so the doors don't make sense. Got it.
He said yeah ill holler at you next time I need to know how to count paper clips. Go sell something or work with concrete chimps [emoji38]
**** you
Stay out of the shop