I have a shower in a basement that I'm looking at doing for some people. The floor is concrete and it is an existing shower that i will be tearing out. The person that did it fifteen years ago just tiled over the existing concrete floor so i was going to do a dry pack job on the floor and use a kerdi drain.
Im just wondering if i could kerdi over the dry pack and kerdi band the corners so the band would be up the walls two inches and then two coat red guard over my cement board walls down over the kerdi.
I would think there would be no warranty from schluterr but it seems like it could work.
thanks.......nicko
Im just wondering if i could kerdi over the dry pack and kerdi band the corners so the band would be up the walls two inches and then two coat red guard over my cement board walls down over the kerdi.
I would think there would be no warranty from schluterr but it seems like it could work.