Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 20 of 26 Posts

·
The Ultimate Wire Hider
Joined
·
4,455 Posts
Yeah.. that was less than 24 hours but based on the shadows of the equipment, they didn't get done in time to beat the morning rush. Never the less it was very well coordinated.
 

·
Super Moderator
Joined
·
11,970 Posts
If they can get that done in 24-48 hours, why the heck does it take so long for our roads to be repaired?... :censored: :laughing:
That's what I was going to say, but I opted for the whole Mike Holmes <30 minute remodel thing instead.:laughing:

I really do wish that most roadwork was done at night though. Let the guys who all stand around watching the 1 guy work earn their dough.
 
1 - 20 of 26 Posts
Top