Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 2 of 2 Posts

·
Registered
Joined
·
5,425 Posts
Def dont score the back, bend the valley on a break..7 to 8" up either side, then get a counter bend on the last 1/2", ice shield the valley, then lay the copper valley in, run the shingle over leaving 2 to 3" of valley exposed at the bottom, and tighten up the reveal at the top, this will allow debris to flow out of the valley easier. G
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top