Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
6,102 Posts
I always leave my work ready to paint. Sanded, nails set but not filled. Sometimes it is easier to sand before installing, eg. sheet goods. On filling - it is proper for woodwork to be primed before filling, so that primer gets into the nail holes. If it's going to be stained then the painter matches the filler to the stain.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top