What tile project are you working on?

12 reading
619K views 4.1K replies 216 participants last post by  TileMarbleGranite  
#1 ·
It's been a little dead hereabouts lately, so I thought I would try and liven things up a little.

Post some pics of your current tile projects in progress. The good, the bad, and the ugly.
 

Attachments

#500 ·
While large floors aren't really the most exciting thing to do for me, they really are our bread and butter.

Nice job Floormasta78. :thumbsup:

Here's what I've been working on, new construction (gasp). And yes, being the nice guy that I am, and since the decorator didn't take into consideration the framed in niche, I cut the little decos out by hand. They were supposed to be clipped corners, but that woulda put the listello too high. HO is very pleased.
 

Attachments

#501 ·
HS345 said:
While large floors aren't really the most exciting thing to do for me, they really are our bread and butter.

Nice job Floormasta78. :thumbsup:

Here's what I've been working on, new construction (gasp). And yes, being the nice guy that I am, and since the decorator didn't take into consideration the framed in niche, I cut the little decos out by hand. They were supposed to be clipped corners, but that woulda put the listello too high. HO is very pleased.
You did those by hand! Wow...you are a nice guy! Looks great.....that's where I have in my fine print on contract about alterations and creating a border verses a pre- packaged deal.....what did you find the best way to do those & just curious....how many did you screw up?
 
#504 · (Edited)
Thanks guys. :)

In case anyone's wondering, or ever needs to do this. I cut the inserts out from the front to my marks, and then completed the cut very, very carefully from the back.

The tile is an inexpensive clay body floor tile from Dal. Very hard to be sure, but not as hard as porcelain.

Truth be told, while it probably took me ten times longer to cut out than clipped corners, it was a lot easier to install.
 
#507 ·
Has been around 2 weeks on the mudset travertine job,so far got 1000sqft of mudset travertine installed and today I waterproof with shower pan and screets mud prep the 200 sqft 2nd floor balcony... Here are some pics from both,monday will be installing 20x20 porcelain on the balcony and after that back to the stone again :thumbup:
 

Attachments