It's been a little dead hereabouts lately, so I thought I would try and liven things up a little.

Post some pics of your current tile projects in progress. The good, the bad, and the ugly.
 

Attachments

#358 ·
I finally worked on my own house! Total redo right down to the studs. Went from a single sink to a double. The only thing that stayed was the Jacuzzi tub. Had it refinished. 45'd all my edges. We dont need no stinkin' bullnose!
 

Attachments

#364 ·
thanks all...

Angus- The sinks i wasnt to crazy about when she picked them out but they arent as shallow as the pics make them out to be.

Opie-its for multi-tasking:eek:

Handy-toilet went from there to the garbage.New one went back into the old spot.
 
#369 ·
1400ssqft 16th floor apartment I have been working for some time cause we had to tear out tile and whisper sound barrier,WSB was pain in the ... to take out,but I dealt with it and installed new one trough out.

It was angle 45 layout,18x18 rectefying iitalian porcelain installed on thinset with 1/16 inch joint,wish it was mudset with this joint,but customer strictly wanted 1/16 and not an 1/8....

Any ways here are some pics from it,finally.
 

Attachments

#376 ·
thanks for the kind word guys,last day at the job has always been the hardest for me especially for this one.Had to finish the rest of the grout that was left,had to touch up the medallion and the boarder with black grout,caulk the elevator and the outside door with matching black caulk,finish up the rest of the shoe molding around the wood base,install the T-moldings at the bedroom doors and place some tile boxes on top...

I honestly hate misc. stuff... Off to the next one,2000sqft floor 20x20 stone installed with mud! (finally),and got 2 more regular bathrooms,master bath with jackuzzy and will find out if we got the bedrooms to do with wood floor and the rest of 2nd floor too,to be announced...Job starts at monday and I promised a friend of mine that he got 900 sqft travertine floor with diamond inserts to help him out for friday and saturday...

I have 2 days to install as much as I can,so it will be all full tile just entering rooms I have to do the cuts around the door jams...Hope I can lay good 70% of full tile cause after saturday he is on his own,and if I dont finish almost all the travertine in 2 days he is in big trouble.Cuts and grout he can take his sweet time and do it,but installing trought out the whole house 20x20 travertine 1/16 joint,he is in big trouble ...gotta get him trough this 2 days,hope I dont have to work sunday I need a lil break before the big mud job.:mad: