it depends on how much scaffold we have on site typically, if we have enough to set up a tower all the way up a wall right from the get go. 1 guy goes up and does soffit while hte siding gets started below by a couple guys,
as the siding gets going while one is finising up 2 guys start another wall starting low as the staging gets free`d up then the soffit will go on. we never run vinyl up through and then install the trim over it..