Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 2 of 15 Posts
He's not talking about what he does on the outside of the stringers, He's talking about what do to with the risers being closed in and say you have 4 stringers for a set of steps, what material do you put on the riser part. like solid blocking first then 1/2" material over it to cover the blocking ?
at least that is what I think

Framerman, awesome set of steps. Nothing better than a clean crisp tight miter.
 
1 - 2 of 15 Posts