Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
435 Posts
fourcornerhome said:
I worked for a boss once that had us remove braces way too early....usually right after he bumps his head on one......
I think this was the case. Taking braces off should be the last thing a framer does. Not enough braces. Plus I think plywood is missing on walls where wind came in, side you don't see on video.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top