I have a question that two contractors have given me two different answers to. I know it sounds logical to tie vertical rebar or to drill and eboxy rebar from my continuous chainwall footings into my concrete block piers, but is it listed as code? One says yes and one says he has never done it . My piers will be two blocks high. Is there a heigth minimum before it is required by code?
 