Hi Everybody, My first post here and i was wondering if anybody has had experience with using a transit and grade rod to figure up a road bore. If so, how do you do it and what is the formula you use? Thank you
Are you attempting to convert your total rise in feet/tenths, to degree of slope?I'm very well familiar with the grade rod and understand it well, but i do not know what equation i would use to figure out what degree the road will need to be bored at. So my question is after i gather up my shots, what formula is used to figure out the degree from transit shots
What equation?My rise is already figured in tenths due to my grade rod. Just wanting to know what number to use for the equation. I'm pretty sure it's my transit shot at the entry of the bore hole and the exit of the bore hole
That is the description of the Pythagorean Theorem.http://www.calculator.net/triangle-...=4&vy=60&va=90&vz=&vb=&angleunits=d&x=94&y=10
Need to know the rise (difference in height)
Run (length of bore)
Use 90 degrees as a given angle.