I have about 2500 ft 1" of water line to install. Across a pasture field, red clay dirt. Going to rent a trencher for my Bobcat with Hi Flow Hyd. How many feet should I average per Hr? What would it cost per ft to hire it done?
Just looking to something to compare my time with, when I get started on it. thanks dennis:thumbsup:
This is an older thread, you may not receive a response, and could
be reviving an old thread. Please consider creating a new thread.
Contractor Talk - Professional Construction and Remodeling Forum
A forum community dedicated to professional construction and remodeling contractors. Come join the discussion about the industry, trades, safety, projects, finishing, tools, machinery, styles, scales, reviews, accessories, classifieds, and more!