Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
131 Posts
Undercut the bottom about 1/4 to 3/8 inch deep. Tilt blade 45 degrees or so to make sharp edge at bottom of your travertine. If water still wants to run back, male a wider relief cut. Good luck.
 
1 - 1 of 1 Posts
Top