Contractor Talk - Professional Construction and Remodeling Forum banner

Small stucco job.

3459 Views 6 Replies 4 Participants Last post by  Rhett_
Started a job on the Village Hall today.
The bottom of the stucco on one flank was falling off about 20ft in length.
I reckon it was caused by the movement joint being left open.
The stucco was a really weak mix, and the lot is really damp.
The galvanised render stop was also rotten, so was replaced with an S/S one.
1 - 1 of 7 Posts
Bah..once it's painted no one will know......except Stuart and all of us here. When we organise a trip to Somerset we'll all go down to the village hall and see if we can find the spot
1 - 1 of 7 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top