Started a job on the Village Hall today.
The bottom of the stucco on one flank was falling off about 20ft in length.
I reckon it was caused by the movement joint being left open.
The stucco was a really weak mix, and the lot is really damp.
The galvanised render stop was also rotten, so was replaced with an S/S one.