Okay all you sewer rats how much a foot for a radiant setup of a 315s/f kitchen. None under the cabinets so take 100s/f off the gross leaving you with a work zone of 215s/f.
Kitchen is located one floor above and is accessible through the open joist of the unfinished basement. Boiler is brand new with a zone preset per the homeowner at the time of the boilers install. 20' pipe run to breach into the first floor in kitchen.
lump sum and s/f pricing will be helpfull. let me know state and city so I can figure for interstate inflation rates.