Contractor Talk - Professional Construction and Remodeling Forum banner

1 - 1 of 1 Posts

·
Registered
Joined
·
58 Posts
Discussion Starter #1
Okay all you sewer rats how much a foot for a radiant setup of a 315s/f kitchen. None under the cabinets so take 100s/f off the gross leaving you with a work zone of 215s/f.

Kitchen is located one floor above and is accessible through the open joist of the unfinished basement. Boiler is brand new with a zone preset per the homeowner at the time of the boilers install. 20' pipe run to breach into the first floor in kitchen.

lump sum and s/f pricing will be helpfull. let me know state and city so I can figure for interstate inflation rates.
 
1 - 1 of 1 Posts