Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 3 of 3 Posts

·
Registered
Joined
·
4,665 Posts
Discussion Starter · #1 ·
I'm sorry, but second floor renovations are a lot harder than first floor ones. 10-25 percent more depending on scope.

The PITA factor goes way up...........What say you?
 

·
Registered
Joined
·
261 Posts
agreed. Nothing more fun than taking all the tools & materials up a stairway that is 1/2" too small for them to actually fit.

Although the dumpster is much more convenient when you can toss stuff out the window into it. so, hey, there's an upside?
 
1 - 3 of 3 Posts
Top