Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 3 of 3 Posts
G

·
Discussion Starter · #1 ·
Hello,
I just need to know what is the time frame for replacing a electrical panle?
I have been told it will take 5-6 hours is this a long time?
Thanks in advance for your time.
 

·
General Contractor
Joined
·
1,035 Posts
4 hours to tag all the circuits - 10 minutes to replace the panel - and 50 minutes to land all the wires and trouble shoot it. It could be less or more - just depends on what is in the panel by way of circuits.
 
G

·
Discussion Starter · #3 ·
hatchet said:
4 hours to tag all the circuits - 10 minutes to replace the panel - and 50 minutes to land all the wires and trouble shoot it. It could be less or more - just depends on what is in the panel by way of circuits.

Thanks you have been a big help!!
 
1 - 3 of 3 Posts
Top