Contractor Talk - Professional Construction and Remodeling Forum banner

1 - 3 of 3 Posts

·
Registered
Joined
·
236 Posts
Discussion Starter · #1 ·
I have a project that has sever water damage on the bottom 3' of the framed wall. This will require the sheeting and the studs to be replaced. Is there a "best practice" for reinstalling mortar ties back to the framing? Or will I just have to bore a hole through the plywood and attach metal strapping to the backside of the mortar with a fastener and onto the wood framing and call it good? I have never messed with this so I don't know if there is a retrofit product available.
 
1 - 3 of 3 Posts
Top