I thought it would be cool to be able to come to one place and view everyones framing, so post away.:thumbsup:
I did a 6 pack of townhouses and the concrete at back side of the was out 8" from one end to the other. Bet y can't guess what happened there lolI remember framing on a duplex foundation where everything was great except the garage party wall. 5" or so out from one end to the other. The builder was not too happy about that one.
Don't have the power to run an electric big enough to keep up. Need 20cfm
Should have the main sheeted and be working on the overlays tomorrow. Everything else of the building is done. Just the roof left.
Under 4 hours to crane today in the cold and windy as hell.
View attachment 172001
So you don't have 220v on site?
That really stinks. What is the issue with no temporary power?Man I've been on a generator for the last 9 months
Man I've been on a generator for the last 9 months
That makes me dizzySome funky roof framing. The double lvl sight built truss on the left is from front wall inside corner to back wall outside corner. Right lvl truss is from back outside corner to point load on the first truss and posted through structure to footer in basement. I had to lay this one out on the deck...