I remember framing on a duplex foundation where everything was great except the garage party wall. 5" or so out from one end to the other. The builder was not too happy about that one.
I did a 6 pack of townhouses and the concrete at back side of the was out 8" from one end to the other. Bet y can't guess what happened there lol
 
Don't have the power to run an electric big enough to keep up. Need 20cfm

Should have the main sheeted and be working on the overlays tomorrow. Everything else of the building is done. Just the roof left.
Under 4 hours to crane today in the cold and windy as hell.
View attachment 172001

So you don't have 220v on site?
 
Well, yeah, if you're running a generator, it's hard to have one big enough. We generally have full power to the site and will sometimes wait a few days for a meter.
 
Some funky roof framing. The double lvl sight built truss on the left is from front wall inside corner to back wall outside corner. Right lvl truss is from back outside corner to point load on the first truss and posted through structure to footer in basement. I had to lay this one out on the deck...
 

Attachments

Start of a four family our big crew is on and its fire wall. Osb, tyvek, 5/8 type "x", and then 3/8 rough sawn. Each half gets a wall w/ 1" air gap. The first few days are mass chaos of man, material and machine and then poof! A building goes up.


This is a house I helped another crew start yesterday. All framed up and ready to sheath
. It's kind of a pig to frame so I'll post some more pics as I can. It has a lot of tall wall and a pita staircase
 