Not just that
I took this job over from a bad GC about a year ago
The HO is paying me once a month with a tight budget until the bank can start funding again
These guys didn’t realize the height changed so they added an 11 7/8” TLI on top off the wall, LOL hinge point. All the window R/O’s wrong, No techoes on main beams, just temp. Post, which was pushing thru the floor and the list goes on and ob.
These tarts even framed the skylight opening in the wrong direction, they framed it sideways!
Steel beam was totally wrong. Wrong height, wrong length, not bolted
We ended up installing a new steel beam welded on top of the existing beam
This house is now sheathed and has a roof on it, AFTER TWO YEARS this is what the HO got for going with the cheaper contractor