I was at a pre-bid meeting at a local military base one time and the engineer had written in the specs that there would be no additional days for bad weather. A couple of the major contractors in town questioned him about it. When he refused to even talk about it, they got up and left the meeting. Three days later an addendum was released addressing rain delays, lol.