Contractor Talk - Professional Construction and Remodeling Forum banner
Status
Not open for further replies.

Post a picture of your current job.

900K views 4.3K replies 507 participants last post by  Leo G  
#1 ·
Since probably every contractor has a digital camera, I think it would be interesting if we pick Friday, for instance, and everyone (even the plumbers) take a picture of what you are doing, or project, and post them on Saturday or Sunday. My camera is in my truck with 2 months worth of pictures on it....and I need to download and sort anyway.

So how about it? Let's all post a picture by this weekend of a project.
 
#4,053 ·
Nothing special. Just fighting boredom by posting on CT.
 

Attachments

  • Like
Reactions: Magnettica
Save
#4,054 ·
no pictures yet, But just bid MGM HQ in Beverly Hills, CA 6 floors of high end TI. The 3,000 SF metal ceilings, went out at $171/ SF and the 85K SF of acoustical ceilings were nearly $448K. Listed low with 2 of three GC's

Largest project i have bid to date.


ML
 
#4,058 ·
Tell the HO it does get just a tiny bit better than that when a cabinet maker knows how to use a ruler.

Image


Image
 
#4,061 ·
This is a typical $3500 bathroom renovation I just finished.
- gutted shower
- replaced tub
- new vanity, mirror, and cabinet
- removed floor and ply
- installed new ply
- all tiles new
- and paint of coarse

This job took me 4 days to complete. Materials cost $1800 the rest was my cut. Not too bad for 4 days work.
 

Attachments

#4,066 · (Edited)
Here is a bathroom we finished up a few weeks ago. The family had a nice sized one bedroom apartment in Manhattan. They purchased the studio apartment next door and we're combining the two to make a large 2 bedroom. We should be finished with the second bathroom later this week.

Image

Image
Oops. Ill try to get the pics up. Im much better with wood than computers...I promise.
Image
 
#4,067 ·
Magnettica said:
Almost! The difficulty was getting the cables back into the box. This panel is in a little closet that used to be a part of the garage. This space has now been transformed to living space so there is some shady framing going on around this panel. For instance, no stud at all to the right side of the panel. Very strange.
Mag,

I know it is a pain to change out flush-mounted panels, conduit OR cables.

Usually, if the opening is cut a tad taller than the panel, I will get all the cables in the panel and then stick it in the wall.

Just stick ~1" of each cable in the connectors, push the slack up into the wall, install panel, then pull all your slack in.

JMO
 
#4,075 · (Edited)
Looks good guy, You will have to tell us about yourself sometime in the introduction area although your pictures are a pretty good start.

I just ran into a problem with 3" glass block. It seems they don't make a 90 degree raduis in 3" only 4". Have know idea why. Just don't. That's why I was curious.

Take a stroll down in the flooring section, you might find some friends there and some pictures of other tile work. :thumbsup:
 

Attachments

#4,077 ·
Thought I'd show some pics of the roof I'm going to be finishing this weekend.

List of work I did on this house:

3-Layer tearoff
Tore off existing board decking (bad shape)
Removed existing brick chimney (no longer in use)
Extended/reframed eaves to 16" all the way around
Installed new air baffles for proper ventilation
Installed new 1/2" ply
Installed sun tunnel
18 Squares IKO Cambridge 30
Cobra Ridge Vent
New soffit/fascia

The hole
Image


Tearoff
Image


New ply
Image


Tried out the IKO recomended 10" stagger
Image


Back side done
Image


Done front/back
Image


Thanks for looking
 
#4,081 ·
What is it? Looks like a speedboat.

Finally, someone who takes pictures when there shop looks like it has been worked in. :laughing:
 
Status
Not open for further replies.
You have insufficient privileges to reply here.