Yeah the lot is low so all the dirt stays. Partial basement on left side for mechanicals. Zero entry floor. Foundation will have reverse brick ledge that we sink floor system into.That's a lot of dirt!!
Where's the hole for the basement:blink:
In your best Arnold voice?I built their kitchen, a double hutch with a window seat, a huge wine rack, filled in a door and put a built in hutch with drawers and a couple of other small projects.
I'll be back.