On new construction, what is the typical payment schedule for plumbers (by percentage of total job cost) after ground work? rough in? finish?
 

·
Registered
Joined
·
11 Posts
Discussion Starter #3
Why is initial so much?

Why so much up front? I'm building a house in So Cal, and I want to be fair to whatever plumber I use, but I also want to minimize my liability if the plumber decides to walk.
 

·
DGR,IABD
Joined
·
9,683 Posts
rolson6432 said:
Why so much up front? I'm building a house in So Cal, and I want to be fair to whatever plumber I use, but I also want to minimize my liability if the plumber decides to walk.
Ah-ha!