Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 6 of 6 Posts

·
Always Learning
Joined
·
8,882 Posts
Discussion Starter · #6 ·
Framing is all punched out. Ready for inspection.


Building Barn Room Beam Stable




Ceiling Light Architecture Line Daylighting


We changed how we do 2x6 headers last year. The 2ply 2x12 header is held flush to the exterior. Then we use 1-1/2" xps and osb as the last layer. Gives plenty of area for drywall and trim to be attached and gives us some r value in our headers.
 
1 - 6 of 6 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top