image-1328022152.jpg

Zero entry floor framing


image-1168391716.jpg

Start of the office


image-463511301.jpg

6" 18 gauge fire wall


image-346333792.jpg

3 layers of 5/8" type x per side


image-2450487111.jpg

Last layer we used Denshield


image-387590680.jpg

Trusses set & bonus sub floor down today. Roof deck tomorrow.
 

·
Super Moderator
Joined
·
26,878 Posts
Nice build, bro.
 
  • Like
Reactions: overanalyze

·
Super Moderator
Joined
·
24,297 Posts
Nice project...:thumbsup:

Sq. footage?

You finishing out also?
 

·
Always Learning
Joined
·
8,635 Posts
Discussion Starter #5
Warehouse has 12000 sq ft with 20' ceilings. Office has 2000 sq ft. We are the technical general of the whole project. There is a separate crew doing the warehouse shell. They can burn through some material!
The office is our baby through the end.
 

·
Always Learning
Joined
·
8,635 Posts
Discussion Starter #6
Framing is all punched out. Ready for inspection.


image-2099422349.jpg



image-1887619605.jpg

We changed how we do 2x6 headers last year. The 2ply 2x12 header is held flush to the exterior. Then we use 1-1/2" xps and osb as the last layer. Gives plenty of area for drywall and trim to be attached and gives us some r value in our headers.
 