Contractor Talk - Professional Construction and Remodeling Forum banner

1 - 2 of 2 Posts

·
Registered
Joined
·
13 Posts
Discussion Starter #1
I am doing an est on removing old t 111 plywood siding. However when the screenroom was constructed the homeowner never designed the screenroom with an overhang. What would be the easiest way to go to prevent the water from getting behind the siding .1 Install flashing what type? 2 add 1x to increase overhang enough to tuck the j channel under? or maybe someone has another idea. thanks acey
 
1 - 2 of 2 Posts
Top