I have a job I need to build up the height of an existing slab 3.5" then veneer pattern bluestone over it. Due to the access/finshed backyard pulling the slab out is not an option. What's the safest way to make up that height. Area is about 60sqft.
Just pour or pump 4,000 psi concrete on top of the existing slab, no reason to remove it, you could put bonding agent on top of the old slab first, won't hurt but not necessary.
 