Joined
·
179 Posts
watched a crew install a metal roof on a house across the street today, it was -9* and even though they swept off 3inches of snow before unrolling insi I cant see covering the snow/ ice that had to still be on the shingles. I have read all the diffrent post on here about screw placement ect, but to me this seems like a screw it down get paid and run thing,,what do you think am I just over thinking it? :blink: