Contractor Talk - Professional Construction and Remodeling Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
56 Posts
Mine was in March and took less than 2 weeks. I left it to the last minute as well so was a little nervous about making sure I pulled permits before it expired but it turned out not to matter because the turnaround time was so quick.

I would not count on them processing it that quickly though. Mine had to be some kind of misfile where my paperwork skipped 9 of the 12 layers of bureaucracy that are usually required.
 
1 - 1 of 1 Posts
Top