mortar screed is the old way, and least expensive.
Tile Line Wall Technology Floor


Soil Floor Grass Landscape Concrete


there are different methods, i like this system
Floor Flooring Hardwood Wood Laminate flooring
 

·
Have Trowel, Do travel
Joined
·
909 Posts
Thanks, that screed is interesting stuff, I wasn't familiar with it. The problem I see is the curing time. From what I read a 2" layer of screed would take close to two months before it was cured enough to lay tile.

An alternative seems to be buying a 'quick-cure' version, like Mapei Topcem Pronto, but then the cost of materials is much higher than concrete. So unless I'm missing something here, I'm not sure screed would work well for this project.
3 days i think with additives
 