Tinner Boy, you have outdone yourself. That is some beautiful work there.
I would only add one thing that I was disappointed not to see:
Next remodel, consider bare studs with the exposed Romex running through them. It gives the H/O the option of wiring in extra plugs and switches on their own after you've finished and left.
No J-Boxes needed or anything like that. Just a good set of insulated dikes and some electrical tape is all they'll need. Maybe a staple or two.
Nice work there buddy!
I would only add one thing that I was disappointed not to see:
Next remodel, consider bare studs with the exposed Romex running through them. It gives the H/O the option of wiring in extra plugs and switches on their own after you've finished and left.
No J-Boxes needed or anything like that. Just a good set of insulated dikes and some electrical tape is all they'll need. Maybe a staple or two.
Nice work there buddy!