Discussion Starter · #1 ·
When figuring up your hours, how many square feet per man hour do you guys figure for the Hardi Shake panels? I did some quite a few years back on a gable and i dont have my numbers anymore for it. I just remember it was dog slow.

Thanks
 

·
Windwash
Joined
·
595 Posts
Remodeler/not full-time sider and I only do one or two projects a year with them and they are usually on gables or dormers only. I figure 3 times lap siding time for 1st floor and 4 times for 2nd floor or gable. Dormers a bit more for the PITA factor. These dormers were 2 guys/2days to trim and side if that helps.
 