Fentoozler
Joined
·
5,623 Posts
Discussion Starter · #1 · (Edited)
How long would it take to complete:
Small bathroom renovation...
- Remove fixtures
- Gut
- Minor improvements to plumbing & elec.
- Sheet rock/dense shield
- Tile [complete shower/bath area; 1/2 wall on other areas]
- Finish and trim


Bath is on the 1st flr of a SFH and there is a 2nd full bathroom available.


Not "How much?"...but "How long?"












BTW....I'm doing the work :laughing:















Now before you place your bets, keep in mind the 2nd flr renovation [total gut job; small dormer addition; bedrooms and bath; windows, roof and siding] took 6 years.















So, how long until the wife stops speaking to me?
:jester:
 

·
Curmudgeon
Joined
·
11,706 Posts
Forget speaking after the
first week.

You will have made
"alternative sleeping arrangements"
at least 3 years before completion. :laughing:
 

·
Fentoozler
Joined
·
5,623 Posts
Discussion Starter · #3 ·
Forget speaking after the
first week.

You will have made
"alternative sleeping arrangements"
at least 3 years before completion. :laughing:

LOL

:laughing:
 

·
Curmudgeon
Joined
·
11,706 Posts
C'mon.
You know we'll walk you
through it.

















At least we'll help you
with the electrical part. :shifty:
 

·
Fentoozler
Joined
·
5,623 Posts
Discussion Starter · #5 ·
C'mon.
You know we'll walk you
through it.

At least we'll help you
with the electrical part. :shifty:
Someone's gonna have to....the wife's not gonna be ANY help at all :laughing:
 

·
Administrator
Maker of Fine Sawdust
Joined
·
55,394 Posts
Take as long as you want. The silent treatment will start in about a week and then all will be nice and quiet for a long time to come. You should have thought of this sooner.:laughing:
 

·
Registered
Joined
·
16,403 Posts
How long would it take to complete:
Small bathroom renovation...
- Remove fixtures & Gut 10hrs. That would include taking out built in bath, shower, toilet, double basins, cabneits, Tile from floor. 12hrs if tile is being removed from wall.
- Minor improvements to plumbing & elec. 12hrs. This would include moving some pipe work, a couple of sockets and re-routeing some cables, Fitting new service valves ready for 2nd fix.
- Sheet rock/dense shield 10-15hrs with making good.
- Tile [complete shower/bath area; 1/2 wall on other areas] 30hrs depending on tiles size and pattern.
- Finish and trim 5-8hr for second fix and tidy up and get water back on.
But this all depends on what gear you buy. But i would guess 10 days without looking at it.
 

·
Fentoozler
Joined
·
5,623 Posts
Discussion Starter · #11 ·
How long since the last work finished?
Finished?
As in done?

Well, on Monday all the permits were closed out...everything passed :clap:....

BUT....

...there is the "punch list".
Unimportant stuff.....like a railing in the stairs....maybe a door on the MBR....:shutup:
 

·
Banned
Joined
·
669 Posts
For her? Too long.
For you, it will never be 100% finished.
for us... who cares.


Just let us know if you burn your house down or she leaves you.
 

·
Fentoozler
Joined
·
5,623 Posts
Discussion Starter · #13 ·
How long it takes may depend on how long you can do "without":whistling

Good Luck with it!
We went w/o the 2nd flr bathroom for 6 years and counting :thumbsup:...it's been complete [actually 100% done] for over a year....but it's so nice no one uses it :laughing:
 

·
Fentoozler
Joined
·
5,623 Posts
Discussion Starter · #14 ·
Take as long as you want. The silent treatment will start in about a week and then all will be nice and quiet for a long time to come. You should have thought of this sooner.:laughing:

You make a solid argument ~ do you side line as a marriage counselor?
:laughing:
 

·
Lack Of All Trades
Joined
·
1,232 Posts
For me realisticly, 4-6 weeks. 8 hours per day, Monday through Friday.Love those "get in-get out" small bath jobs.
 

·
Registered
Joined
·
685 Posts
We went w/o the 2nd flr bathroom for 6 years and counting :thumbsup:...it's been complete [actually 100% done] for over a year....but it's so nice no one uses it :laughing:
not quite the " do without" I was eluding to..........:whistling
She may cut off more then conversation...........:eek:

Good Luck tho, I hope it gets done sooner then expected:thumbsup:
 

·
Al Smith
Joined
·
2,392 Posts
5X8 three fixture bath gut and redo.

took me exactly 120 hours by myself just the past two weeks. including demo of wire lath mud half way up and mud floor demo. sledgehammer cast iron tub. re-mud floor, durock tub/ shower. pick up material, cept for clients special ordered tile. set fixtures.

also talked me into a paint job and sealing of all tile.

http://awsmith.com/images/bathroom/

I don't generally do baths. But client was the elderly mom of a friend
 

·
I like Green things
Joined
·
23,068 Posts
took me exactly 120 hours by myself just the past two weeks. including demo of wire lath mud half way up and mud floor demo. sledgehammer cast iron tub. re-mud floor, pick up material, cept for clients special ordered tile. set fixtures.
I average on 5x8, 6x8 about 3 1/2 weeks.

Nothing usually goes as planned.

My kitchen has been 1 year. tore it off and started over. Just got it painted, and getting ready to start milling the flooring. Should be done some time NEXT year.

Good thing the old lady can't cook. She does whip up a good pot pie in the microwave:laughing::laughing:
 