I am submitting a bid for a full bed veneer fireplace that will be adhered to stud framing wrapped Hardiebacker board.
Just wondering if this is typically the GCs responsibility to install the Hardiebacker then mine to come in to tape and thinset and proceed with veneer installation? This will determine if I include it within the bud. Thanks in advance
When in doubt include it as a line item so I know if I should eliminate from your number.
$300 fireplace
$200 hearth
$100 supply and install hardiebacker.
Then I consider if I want to or can install the hardie myself cheaper or let you do it.
You are covered, I am aware of the issue and we both avoid a problem.
It was very vague just had elevation/plan view and a schematic of the wainscoting install not the fireplace. Water proofing, CMU stone ledge, veneer, etc