I have this job coming up that involves gluing smooth white 4 * 8 panel boards to drywall. Its at a daycare and will be installed sitting on top the base 4 feet high horizontal around the room. I'll be using Pl construction adhesive to attach the panels to the drywall no nails. The walls have all metal studs.
My question is how long do you think before I can move on to the next panel, I hope I dont have to brace it somehow or have to babysit it for an hour. The panels have that smooth i believe masonite back. After I dab some adhesive on the panel I think I should run a 3/16 notched trowel on each of the dabs of PL to flatten it down, what do you guys think.
Well anyway I hope I've explained the details of the job enough so you get the picture. Got around 36 sheets of these panels to install in 3 different rooms along with top caps, dividers and inside and outside corners.
My question is how long do you think before I can move on to the next panel, I hope I dont have to brace it somehow or have to babysit it for an hour. The panels have that smooth i believe masonite back. After I dab some adhesive on the panel I think I should run a 3/16 notched trowel on each of the dabs of PL to flatten it down, what do you guys think.
Well anyway I hope I've explained the details of the job enough so you get the picture. Got around 36 sheets of these panels to install in 3 different rooms along with top caps, dividers and inside and outside corners.