Hey guys. I have a client that wants their basement floor lowered a good 12-18 inches. This is something I don't have alot of exp with. (no worries I am getting quotes as well)
So what's the best way to do this. ?? I know there are a few methods.
The attached picture is what I am planing on doing. I figure we will dig down to the existing footings. Then start working 4' sections lowering and adding the footing extension.
Any tips or advice from you guys is always appreciated
So what's the best way to do this. ?? I know there are a few methods.
The attached picture is what I am planing on doing. I figure we will dig down to the existing footings. Then start working 4' sections lowering and adding the footing extension.
Any tips or advice from you guys is always appreciated