Discussion Starter · #1 ·
A new house will be built on a frost-protected shallow foundation, basically a thickened-edge floating slab, on a rural plot in a cold climate.

Water supply will be from nearby well, yet to be drilled. Sewage is to adjacent septic tank and field.

What is done in a system, design-wise, to ensure a quick and prudent pre-freeze closing up of the house, and what is done to make it possible to open up for a couple weeks at a time of winter visits?
 

·
Registered
Joined
·
3,005 Posts
A new house will be built on a frost-protected shallow foundation, basically a thickened-edge floating slab, on a rural plot in a cold climate.

Water supply will be from nearby well, yet to be drilled. Sewage is to adjacent septic tank and field.

What is done in a system, design-wise, to ensure a quick and prudent pre-freeze closing up of the house, and what is done to make it possible to open up for a couple weeks at a time of winter visits?

Better ask Piffen!:thumbsup:
 