I need to run conduit before I have a concrete patio and side yard poured. It will be approximately 100' long. I would prefer to use plastic conduit because of the price but I also want to avoid digging 18" down. I am in CA. How deep do I need to burry plastic conduit under a 4" concrete slab and how deep does metal conduit have to be buried under a 4" concrete slab" TYIA
 