Working on finishing this.
A company from the island came over and did the timberframing. Roof is done except for some small details.
I was contacted by the architect/owner to help finish.
Will be doing flashing, sealing, wrapping, cedar bevel siding, partition walls, tiling, and trim.
Will post progress pics for those interested.
The back of the house will be glass. Front of the home is SIP (structural insulated panel) walls.
All of the Cedar is old growth, it is all prefinished and was from a nature reserve where the trees blew down and the elk wouldn't return because of the mess with the trees.
All of the beams, rafters and columns are built-up from 2x cedar and fastened together with GRKs.
See more pictures on our facebook album, I will be taking more with a better camera as well.
A company from the island came over and did the timberframing. Roof is done except for some small details.
I was contacted by the architect/owner to help finish.
Will be doing flashing, sealing, wrapping, cedar bevel siding, partition walls, tiling, and trim.
Will post progress pics for those interested.
The back of the house will be glass. Front of the home is SIP (structural insulated panel) walls.
All of the Cedar is old growth, it is all prefinished and was from a nature reserve where the trees blew down and the elk wouldn't return because of the mess with the trees.
All of the beams, rafters and columns are built-up from 2x cedar and fastened together with GRKs.
See more pictures on our facebook album, I will be taking more with a better camera as well.