Hey guys,it's been awhile since I've been on.Have been laid off since Christmas and not sure when I will be called back to work.Anyway,I have picked up some work,and one is a 350 sq ft natural stone job.
I dont lay much natural stone,so I need to ask how much mason and sand do I need.I kinda figured about 15 bags of mason and 2 tons of sand.But also considering using type s premix since we are so far out in the country and the local sand plant doesn't deliver.

Going with mason and sand it would be around 200 bucks for these two items.Premix,would be around 250,but without the hassall of hauling the sand to the job somehow.

Anyway,thanks in advance for the help.:thumbsup:
 