Discussion Starter · #3 ·
What if the the plumbing runs across the framing. Can i just frame across the broken up concrete (assuming it was running across and not parallel to broken concrete) and have the plumber come in and run under framing and just back fill?
 

·
Super Moderator
Joined
·
10,605 Posts
What if the the plumbing runs across the framing. Can i just frame across the broken up concrete (assuming it was running across and not parallel to broken concrete) and have the plumber come in and run under framing and just back fill?
yes. Or plumb first, pour concrete and then frame.
 

·
Super Moderator
Joined
·
10,605 Posts
We Break up, plumb, new concrete ,then frame.
That is preferred, but if schedules don't quite synch, the framers can get in there after the concrete is cut. A lot of the time, if the plumber marks it, we will even do the concrete demo for him.
 

·
Registered
Joined
·
4,364 Posts
That is preferred, but if schedules don't quite synch, the framers can get in there after the concrete is cut. A lot of the time, if the plumber marks it, we will even do the concrete demo for him.
We try and mark out with the plumber and then do the demo. Catch each others mistakes and everyone stays happy.
 

·
Hair Splitter
Joined
·
18,330 Posts
We Break up, plumb, new concrete ,then frame.
Agreed.

And agreed on the mark up.

We also do a walk through and cover a lot of the details, schedules and formulate a game plan...which usually is tossed out the window on day one. :laughing:
 

·
Registered
Joined
·
4,364 Posts
Agreed.

And agreed on the mark up.

We also do a walk through and cover a lot of the details, schedules and formulate a game plan...which usually is tossed out the window on day one. :laughing:
Usually by the end of the walk through :laughing:
 

·
Registered
Joined
·
819 Posts
I think it depends on the plumber....id rather have it framed in first....I bust up around the framing....never been a problem...that way I can do the sewer and rough plumbing at the same time..
 

·
Talking Head
Joined
·
5,388 Posts
Depends on the amount of trenching
I'm doing a pit and pump right now that had 80 feet of cuts. That would have sucked if the walls were up. I just tacked the walls that crossed the trench in place during framing and pulled them the day the cutting crew came.
 

·
Registered
Joined
·
819 Posts
correct..it depends on the amount....im adding a shower to a basement powder room on Wednesday.....all I need is a 2' x 7' trench from the lav to the shower....I can do the whole rough in 1 day ....why frame it later and make it a 2 day project....I like to make money
 