Contractor Talk - Professional Construction and Remodeling Forum banner

1 - 2 of 2 Posts

·
Registered
Joined
·
438 Posts
Discussion Starter #1 (Edited)
This is a 8 zone hot water heating system that we are installing for a church rectory, the old system was all hanging of the side of the boiler.

We do a lot of this design as we can construct them ahead of time in the shop and just drop them off and connect.

BJD
 

·
DGR,IABD
Joined
·
9,683 Posts
I'm pleased to learn that you're prefabbing in the shop, and not in the basement. I really would enjoy seeing the picture. It doesn't appear to be with the post.
 
1 - 2 of 2 Posts
Top