Flooring Picture Post
Day #1
Rough plumbing inspected and passed. I used Mapei Topcem Premix to fill the areas that will be tiled so I didn't have to wait 28 days. Ran for faux rebar into the existing slab and brushed some admix to prep. the Topcem was dried in about 4 hours!
Awaiting the framers....