Contractor Talk - Professional Construction and Remodeling Forum banner

topcem

  1. Flooring Picture Post
    Day #1 Rough plumbing inspected and passed. I used Mapei Topcem Premix to fill the areas that will be tiled so I didn't have to wait 28 days. Ran for faux rebar into the existing slab and brushed some admix to prep. the Topcem was dried in about 4 hours! Awaiting the framers....
Top