Contractor Talk - Professional Construction and Remodeling Forum banner

settlement

  1. Excavation & Site Work Picture Post
    During construction of the building the intermediate pilings and grade beams called for on the structural drawings were excluded. The floating pier and footings that were installed had settlement of as much as 6”. In addition, the right front corner of the house and masonry fireplace had 1” of...
Top